Skip to product information
Wicker Egg Chair – Oversized Indoor Outdoor Lounger for Patio
$490.89
Sale price
$490.89
Regular price
Wicker Egg Chair — part of the Sunflower Lane collection.
About This
- ALL-WEATHER DESIGN: Water- and UV-resistant wicker with weather-resistant cushions make this seat a natural addition to your patio, garden, poolside, and more
- HIGH-QUALITY MATERIALS: Enjoy this seat for years thanks to durable, water-resistant wicker, tightly woven over a powder-coated steel frame
- COMFORT AND SUPPORT: Four removable cushions are packed with extra thick padding while the offset, four-legged design with adjustable foot pads supports weights up to 440 pounds!
- OVERSIZED DESIGN: An extra-wide opening gives ample overhead expanse for taller people, while a large seat lets you curl up in comfort with your favorite books or media devices; OVERALL DIMENSIONS: 24"(L) x 40"(W) x 56"(H); WEIGHT CAPACITY: 440lbs.
- INDOOR ACCENT SEAT: A distinct, open-weave pattern adds a bohemian touch and complements the decor of your living room, bedroom, or sunroom
Overview
- Brand : Best Choice Products
- Color : Gray/White Sand
- Material : Alloy Steel, Wicker
- Product Dimensions : 24"D x 40"W x 56"H
- Size : Set of 1